Whitefield to Challaghatta Metro – Purple Line Bangalore

Whitefield to Challaghatta Metro

Here’s everything you need to know about the Purple Line Bangalore Metro, including its route, operating hours, station list, and other relevant information. Whether you’re a frequent commuter or a first-time traveler, our guide will help you plan your trip.

BMRCL awards contract worth Rs. 48.62 crore to extend the Bangalore Metro Purple Line. 

The Bangalore Metro Rail Corporation Limited (BMRCL) has awarded a Rs. 48.62 crore contract to M Venkata Rao Infra Projects Private Limited to extend the Bangalore Purple Line Metro from the Whitefield metro station. 

The key details are:

There will be no new stations in the extension, which will only be 588 meters long.

The goal is to improve train operations by establishing a train reversal crossover-track facility.

The contract also includes the construction of a 28-meter extension of the third line at the Whitefield Depot, which is currently under construction.

BMRCL requested bids for the project in October 2023, with a cost estimate of Rs. 42.30 crore and an 18-month completion deadline.

Check Our Commercial Property For Lease in Whitefield

The line ends 14 meters north of Whitefield station, so trains use only one platform. Once the extension is completed, high-frequency train operations will run smoothly.

BMRCL launches short-loop train services on the Purple Line in Bangalore during morning peak hours.

BMRCL began operating short-loop train services on the Bangalore Purple Line during morning peak hours on February 26. The move is intended to accommodate the heavy passenger traffic during these hours.

These are the Key Highlights

This service is available every working day except for general holidays and weekends (Saturday and Sunday).

The trains will run between Nadaprabhu Kempegowda Station, Majestic, and Garudacharpalya Metro Stations.

The increased frequency of trains will benefit commuters heading to Trinity, Indiranagar, Benniganahalli, and KR Puram Metro stations.

Metro trains will run every three minutes between 8.45 and 10.20 a.m. in this section. 

An Overview of the Purple Line Metro in Bangalore

Bangalore, one of India’s fastest-growing cities, has emerged as a center for modern infrastructure and transportation. One of the most significant developments in this regard has been the Bangalore Metro Purple Line, which connects Whitefield to Challaghatta. The metro line, which went fully operational on October 9, 2023, has become a popular destination for commuters and tourists.

Bangalore Metro

About the Purple Line Metro Bangalore from Whitefield to Challaghatta.

The Purple Line Metro in Bangalore is part of the Namma Metro network. This metro line features both elevated and underground metro stations. It has made commuting in Bangalore extremely convenient, with easy access from Whitefield to Challaghatta Metro Station.

Phase I of the Purple Line in Bangalore began in 2011 with only 23 metro stations. Of the 23 stations, 17 were elevated, 5 were underground, and 1 was at grade.

Phase II of Bangalore’s Purple Line metro began operations on October 9, 2023. With its completion, the Purple Line (Whitefield to Challaghatta) has 37 stations and provides complete connectivity from Challaghatta in the southwest to Whitefield in the east. The total length of the metro purple line has also increased to 43.49 kilometers.

All of the underground stations on this line are built using the cut-and-cover method. Most underground stations are around 300 metres long and 25 metres wide. The interchange station at Majestic is much larger.

Previously, no toilets were available at any Purple Line stations. Then, in 2013, BMRCL, or Bangalore Metro Rail Corporation Limited, responded to public demand by constructing the first toilets at the Baiyyappanahalli and Indiranagar stations. To assist visually impaired commuters, yellow tactile tiles are installed at all purple line metro stations. 

Purple Line Metro Bangalore – Quick Facts

Purple LinePhase IPhase IITotal
Length 25.27 km17.86 km43.49 km 
Type 17 elevated, 5 underground, and 1 at-gradeElevatedElevated, Underground and At-Grade
Number of Stations231437
Status OperationalOperationalFully Operational
Estimated Ridership 4.07 lakh/day (2021)6.2 to 7 lakh/day7 lakh/day
Stretch  – Baiyyappanahalli to MG Road- Mysore Road to Magadi Road-Mysore Road to Kengeri
-Baiyappanahalli to KR Puram
-Kengeri to Challaghatta
-Whitefield to Challaghatta

Purple Line Metro Route Map: (Whitefield to Challaghatta)

Here is the official route bangalore metro map for the Purple Line metro in Bangalore, from Whitefield to Challaghatta. It intersects all other lines at some point, as shown in the images below:

Bangalore Metro Map

Purple Line Metro Stations on the Bangalore Route 

The stations between Whitefield and Challaghatta on Bangalore’s Purple Line metro are listed below.  

Sr. No.Station NameTypeStatus
1Whitefield Elevated Operational 
2Channasandra ElevatedOperational 
3Kadugodi ElevatedOperational 
4Pattandur AgraharaElevatedOperational 
5Sri Sathya Sai HospitalElevatedOperational 
6NallurhalliElevatedOperational 
7KundalahalliElevatedOperational 
8Sitharama PalyaElevatedOperational 
9Hoodi JunctionElevatedOperational 
10Garudacharapalya ElevatedOperational 
11Mahadevapura ElevatedOperational 
12 KR PuramElevatedOperational 
13Benniganahalli ElevatedOperational
14BaiyappanahalliElevatedOperational 
15Swami Vivekananda RoadAt-GradeOperational
16Indiranagar ElevatedOperational
17Halasuru ElevatedOperational
18Trinity ElevatedOperational
19Mahatma Gandhi RoadElevatedOperational
20Cubbon Park (Sri Chamarajendra Park)UndergroundOperational
21Dr. BR Ambedkar Station (Vidhana Soudha)UndergroundOperational
22Sir M. Visveshwaraya Station, Central CollegeUndergroundOperational
23Nadaprabhu Kempegowda station, MajesticUndergroundOperational
24Krantivira Sangolli Rayanna Railway StationUndergroundOperational
25Madagi RoadElevatedOperational
26Balagangadharanatha Swamiji Station, HosahalliElevatedOperational
27Vijayanagara ElevatedOperational
28Attiguppe ElevatedOperational
29Deepanjali NagaraElevatedOperational
30Mysuru Road ElevatedOperational
31Nayandahalli ElevatedOperational
32Rajarajeshwari NagarElevatedOperational
33Jnanabharathi ElevatedOperational
34PattanagereElevatedOperational
35Kengeri Bus TerminalElevatedOperational
36Kengeri ElevatedOperational
37ChallaghattaElevatedOperational

Interchange stations on the Purple Line Metro, Bangalore

The Purple Line metro in Bangalore is linked to a number of other metro stations that serve different lines. These interconnections allow for quick and seamless travel from one location to another. The following is a list of purple line metro Bangalore stations that provide interconnections at various junctions: 

Sr. No.Purple Line Metro StationInterconnecting Line/StationStatus
1Whitefield Whitefield Railway station Operational 
2Nallurhalli Whitefield TTMCOperational 
3KrishnarajapuramBlue line- KR Puram Railway StationUnder Construction
4BenniganahalliBenniganahalli Railway Stationto be Operational in Sep 2023
5BaiyappanahalliBaiyappanahalli Railway StationOperational 
6Mahatma Gandhi RoadPink LineUnder Construction
7Nadaprabhu Kempegowda station, MajesticGreen Line- KG Bus StationOperational
8Krantivira Sangolli Rayanna Railway StationCity Railway StationOperational
9Balagangadharanatha Swamiji Station, HosahalliOrange LinePlanned
10Attiguppe Vijayanagara TTMCOperational
11Mysuru RoadOrange LinePlanned
12JnanabharathiJnanabharathi Railway StationOperational
13Kengeri Bus TerminalKengeri TTMCOperational

Whitefield-KR Puram Metro Corridor: The Bangalore Metro Purple Line

The Whitefield-KR Puram metro line (Namma Metro) is part of the Baiyappanahalli to Whitefield Phase 2 line. The BMRCL (Bangalore Metro Rail Company Limited) opened the first phase of the Whitefield-KR Puram line on March 25, 2023. The line shortened the distance between Whitefield and KR Puram to 22 minutes.

The metro line has 12 stations and covers approximately 13 kilometres. The remaining length of the Baiyappanahalli to KR Puram line is scheduled to open in September 2023.

Prime Minister Narendra Modi inaugurated the Whitefield-KR Puram metro line on March 25, 2023. The general public’s operations began the following day, March 26, 2023.

Whitefield-KR Puram Metro Line: Quick Facts

ParticularsDetails
Name of Metro LineWhitefield-KR Puram Metro Line
ColourPurple
No. of Stations12 Stations 
TypeElevated Stations
StatusLaunched on 25 March
Estimated CostApprox Rs. 4,500 Crores
Estimated Ridership1.2 lakh commuters daily

Whitefield-KR Puram Metro Line Stations

The table below displays the Whitefield-KR Puram metro line station names.  

Sr. No.Station NameType
1Whitefield Elevated 
2Channasandra Elevated
3Kadugodi (Tree Park)Elevated
4Pattandur Agrahara Elevated
5Sri Sathya Sai HospitalElevated
6NallurhalliElevated
7KundalahalliElevated
8Sitharama PalyaElevated
9Hoodi JunctionElevated
10Garudacharapalya Elevated
11Mahadevapura (Singayyanapalya)Elevated
12Krishnarajapuram (KR Puram) Elevated

Whitefield-KR Puram Route Map

Here is the official route map for the all-new Whitefield-KR Puram metro line.  

Namma Metro Purple Line

Whitefield-KR Puram Metro Line Fare

According to BMRCL (Bangalore Metro Rail Corporation Limited) sources, the maximum fare along the Whitefield-KR Puram stretch is Rs 35. Initially, this route had seven trains that ran every 10 to 12 minutes.

Images of the Whitefield-KR Puram Metro Line

Whitefield Metro Station

Baiyappanahalli to KR Puram Metro Corridor: Purple Line Bangalore

The long-awaited two-kilometre Baiyappanahalli to KR Puram metro stretch of the Bangalore metro purple line will open in October 2023.

This stretch completed the Bangalore Purple Line metro route and bridged the gap between the Baiyappanahalli and KR Puram stations. It connects the Whitefield area to Kengeri, Challagatta, and other central and southern Bangalore areas.

The trial runs began in July, and the Bangalore Metro Rail Corporation Limited (BMRCL) is closely monitoring the challenges ahead of the official launch.

These trial runs looked at track alignment, speed, civil interface, and other technical issues. To ensure safety and functionality, a load test was conducted on the Open Web Grinder (OWG) located on the Indian Railways track in Bennaganahalli.

Bangalore’s Namma Metro became the city’s longest and uninterrupted metro line after the Baiyappanahalli to KR Puram and Kengeri to Challaghatta lines were opened.

Bangalore Purple Line Metro (Whitefield to Challaghatta) Timings

Challaghatta Metro Station

The entire Bangalore Metro Timings Purple Line from Whitefield to Challaghatta is operational from 5:00 AM to 11:00 PM, with a frequency of 5-7 minutes. 

The frequency of trains varies according to peak and off-peak hours.

Trains will run every 10 minutes between Whitefield (Kadugodi) and Pattanduru Agrahara.

Every five minutes from Pattanduru Agrahara to Mysore Road.

Every three minutes, from Nadaprabhu Kempegowda Station – Majestic to MG Road.

Trains leave Majestic Station every 3 minutes for MG Road.

The travel time from Mysore Road to Challaghatta will be ten minutes.

The final train from Whitefield (Kadugodi) will depart at 10.45 p.m.; from other terminals, it will depart at 11.05 p.m.

During off-peak hours, trains run every 8 to 15 minutes.

On Sundays, the times differ slightly. Every Sunday, the trains run from 7:00 AM to 10:40 PM. These trains are typically timed at 8- 10 minute intervals.

Purple Line Metro in Bangalore Fare

Purple Line - Bangalore Metro

Bangalore metro service is by far the most affordable and convenient mode of transportation in the city. The fare from Whitefield to Challaghatta is around Rs. 57–60.

The following table shows the various fares for the Bangalore Purple Line metro stations.

Station NameMetro Fare from Baiyappanahalli (Rs)
Swami Vivekananda Road9.5
Nadaprabhu Kempegowda station, Majestic28.5
Dr. BR Ambedkar Station (Vidhana Soudha)23.75
Mysuru Road42.75
Athiguppe 38
Deepanjali Nagar39.9
Magadi Road33.25
Vijayanagar 36.1
Sir M Visveshwaraya Station, Central College26.6
Cubbon Park20.9
Mahatma Gandhi Road19
Halasuru 14.25
Trinity 17.1
Indiranagar 14.25

If you frequently travel by metro in Bangalore, you can purchase a Smart Card directly from any authorized vendor. To get a Smart Card, you must pay a security deposit. Following that, the card can be used for 30 days or until your pre-loaded cash balance runs out, whichever comes first.

Purple Line Metro Bangalore: Upcoming Phases and Extensions

Phase 3 of the Bangalore Metro Purple Line: from Malur in Kolar to Bidadi in Ramnagara 

The Karnataka government has recently announced plans to extend the Purple Metro Line in Phase 3. The extension will extend in two directions: east to Malur town in Kolar district and west to Bidadi in Ramanagara district. The proposed extension will significantly improve public transportation in these areas. It will help thousands of commuters who travel to and from these areas on a daily basis. The stretch between Malur town and Ramanagara is expected to significantly expand the existing metro network. It will help to alleviate traffic congestion and save commuters time.

Purple Line Metro Bangalore Ridership

Since the Purple Line’s full operation on October 9, 2023, daily ridership has increased significantly.

On October 13, the Byappanahalli-(Whitefield) section recorded over 7,50,000 riders, 50,000 more than on October 11.

Even the day after the launch, October 10, ridership exceeded 7 lakh.

Given the surge in numbers, BMRCL intends to increase the frequency of the metro along the Purple Line Bangalore metro route. They intend to run trains every three minutes once new trains arrive.

Additional baggage-screening machines have also been installed at the Benniganahalli and Pattandur Agrahara metro stations to ensure a smooth commute.

The Namma Metro network’s busiest station is the Nadaprabhu Kempegowda Interchange Station, also known as Majestic Metro Station. It now has 41,803 passengers.

Purple Line Metro Bangalore’s Impact on Real Estate

The newly operational Namma Metro Purple Line has caused a significant increase in property prices and rentals in east Bangalore. Within six months, Realtors reported at least a 20% increase in rentals and more than 30% in property prices.  

Summary: Purple Line Metro in Bangalore (Whitefield and Challaghatta)

The Bangalore Purple Line Metro is a large train network that provides convenient access to various parts of the city. With the entire Bangalore Purple Line operational, residents can easily travel between Whitefield and Challaghatta.

Check Out Commercial Property In Whitefield For Lease

1) DivyaSree Technopark

DivyaSree Technopark is a 75-acre mixed development that includes premium residential apartments and an existing commercial development of 4.72 million square feet. The total building size of the A1 block (non-SEZ) is 608,930 square feet.

Rent – ₹ 22.75 Lacs/ Per Month – ₹ 65 psf

2) Aarna Rajpath

Aarna is an upcoming premium commercial building on Varthur Main Road, Nera Whitefield, Contact Us For More Details

Rent – ₹ 6.06 Lacs/ Per Month – ₹ 120 psf

Leave a Reply

Your email address will not be published. Required fields are marked *